8 megawatt electrolysis plant

06.04.2023
MSR-Innovations takes on the preparation of a feasibility study. The task is to produce hydrogen on a brownfield site. The hydrogen is produced with an electrolysis system, which is supplied with energy from a PPA (Power Purchase Agreement). The produced hydrogen is to be compressed to 500bar and filled into trailers or swap body containers. The quantity of hydrogen stored on site is not to exceed 6 tonnes of H2, so that a BImSch approval procedure is sufficient.



